Road bans

  • 03.4.2024

The road direction Ohrid - Resen (and vice versa) through the Galichica National Park has been open for traffic for all types of vehicles with a total weight of up to 3.5 tons since April 1, 2024.

  • 31.3.2024

Notice of temporary change of traffic regime on state road R1101 in the stretch from Novo Lagovo to Topolčani, due to the start of construction activities in connection with the project Corridor 8 and Highway 10D, roads in Section 4 km. That is why from 01.04.2024 the traffic will proceed according to the approved traffic project for the temporary traffic regime.

  • 26.3.2024

On March 26, 2024, from 2:15 p.m., a temporary change was made to the traffic regime on the section of the highway - 300 meters after the "Magari" overpass to the "Belvi" interchange during the repair and rehabilitation of the state road A1/A2 section Skopje - Kumanovo (right lane), where with a vertical traffic signal for a length of 200 meters, the traffic is channeled and slowed down from the left (for overtaking) traffic lane to the middle (for driving) traffic lane, so that after a length of 1500 meters, all traffic will takes place in the overtaking traffic lane (left), and the middle and forced stopping traffic lanes will be closed to traffic.

  • 25.3.2024

Temporary change of traffic regime on state road R1101 section Prilep - Bitola due to intensification of construction activities in connection with the project "Rehabilitation of the road hull near the bridge over the Shemnica river on State road R1101 km 85+903, section Prilep - Bitola", and that from 27.03.2024 there will be a complete closure of the section.

  • 19.3.2024

All road users are informed that on the main road A2 Kriva Palanka - g.p. Deve Bair, due to road works and more frequent landslides, drive vehicles extremely carefully for their own and general safety.

Adequate traffic signals have been installed in certain places.

  • 07.11.2023

07/11/2023

GD Granit AD Skopje reports that according to the newly issued approval for temporary traffic regime due to construction works on Highway A4, section GP "Blace" - Skopje ("Stenkovec" section) Subsection 1 - from 08.11.2023. the existing local road to the village. Blace from the A4 highway before the Border Crossing will be closed, and access to the village of Blace will be provided by a temporary road before the Border Crossing, according to the set traffic signals. The previously established temporary traffic regime remains, according to which 2 km before the Border Crossing "Blace" at the site of the construction works, the traffic takes place according to a two-way traffic regime (with two new roundabouts) and appropriate traffic signals are installed.

  • 06.11.2023

06/11/2023

On 07.11.2023 from 1:00 p.m. a temporary change to the traffic regime has been made on the section of Highway A1, Petrovec - Katlanovo - rehabilitation with the expansion of the A1 highway (left and right carriageway in both directions) for a length of 6000 m, traffic will take place on the newly constructed carriageway (Katlanovo - Petrovec) two-way, with vertically placed signaling, while the roadway Petrovec - Katlanovo will be closed to traffic.

  • 24.10.2023

24.10.2023

The reconstruction of the regional road 1301 (Ohrid - Sveti Naum) will begin from October 24, 2023.

The traffic will proceed smoothly with appropriate signalling.

  • 19.10.2023

19.10.2023

From 23.10.2023 reconstruction of the existing Želino toll station will begin, on state road A2 - section Skopje - Tetovo. The traffic on the highway will take place according to the approved traffic time schedule.

  • 08.9.2023

08/09/2023

From 11.9.2023 the temporary traffic regime will be established in the tunnel at the station km 6+326 to km 6+366, on the right side of the tunnel, direction Blace - Skopje, due to construction works - rehabilitation of the tunnel. There will be light signaling with alternating passing of vehicles.

  • 14.12.2022

14/12/2022

Due to the construction of the express road from Gradsko to Drenovo, at the place where the new Gradsko interchange was built, on the state road A1, the intersection of Veles-Negotino, traffic regime changes will be applied. The timing regime will apply in both directions on the E-75 highway. The traffic will be uninterrupted, at the speed of V=80km/h in the zone of the building. The regime will apply until the complete construction of the new junction Gradsko.

  • 11.12.2022

11/12/2022

Information on moving through JASEN

Skopje - Macedonian Ship

from 07:30 - 09:00
from 12:00 - 12:45
from 16:00 - 18:00

Macedonian Shtip - Skopje

from 06:00 - 07:00
from 10:30 - 11:00
from 13:00 - 13:45
from 18:30 - 20:00

  • 13.10.2022

13/10/2022

GP Ilinden - Struga reports that on the Kicevo - Ohrid road, on the section from the village of Trebenishta - Ohrid, a modified traffic regime has been introduced since 10/13/2022. Road users are advised to respect the posted traffic signals and adjust their speed according to road conditions.

  • 29.9.2022

29/09/2022

On the regional road R1102, i.e. section Veles - Gradsko, due to construction works, the said section will be closed to traffic from September 28, 2022. in the next 9 months, the traffic will also take place according to the approved time traffic regime.

  • 21.7.2022

21/07/2022

STRABAG AG reports: Based on the Approval for temporary change of traffic regime on state road A1 – Veles – Negotino section, issued by the Ministry of Transport and Communications with number 11-up-46/4, dated 21.07.2022, which refers to the construction of the new Gradsko interchange (as part of the A1 highway), construction works will be carried out on the above-mentioned section in the next 12 months, and the temporary change of traffic regime will be applied. The temporary regime will be applied in both directions of the E-75 highway, in the construction zone of the new Gradsko interchange, in the direction of the Bogorodica border crossing and in the direction of the Tabanovce border crossing. Traffic will proceed in the driving traffic lane, while it will not be able to drive in the overtaking traffic lane.

  • 19.7.2022

19/07/2022

On the road Struga – g.p. Qafasan, on the section from Kamara gas station - m.v. Mali Vlaj, road users are advised to reduce their speed to 40 km/h. due to construction work on the road (patching potholes).

  • 05.4.2022

05/04/2022

According to information from the Pelagonija Construction Company AD Gostivar, since 04/05/2022, construction activities are being carried out for the rehabilitation of landslides at km 19+500 (near the village of Globochica) and 24+000 (near the village of Lukovo) on the regional road R1201 section Struga - Debar. Traffic takes place alternately and is regulated by traffic lights.

  • 02.3.2022

02/03/2022

"Stanton Construction LLC" reports on a temporary change in the traffic regime on the state road A1 section, Gradsko - Prilep (Farish-Prilep) section, specifically after the bridge on the r. Raec towards Pletvar for the purpose of starting construction activities on March 2, 2022. in connection with the project Rehabilitation of state road A1, Farish-Prilep section and will last for the next 12 months. Due to the construction works, there will be a diversion of traffic along two lanes, drivers should follow the posted road signs and drive at a reduced speed when passing the work section.

  • 01.3.2022

03/01/2022

On the road Kicevo - Ohrid, due to construction works on several sections, traffic is taking place with deviations. Adequate traffic signals have been installed and therefore we recommend strict adherence to the same and adjusted speed of movement.

Important info:

Bank data: 200000002559725

Unique tax number: 4030989230167

Info telephone: 02 / 3138 724

Contact telephone: +389 2 2561 502

 

Info contacts:

fax: 02 / 3138 736

dispatch: 02 / 2561 502

email: [email protected]